Standard_Parts_Catalogue
Page 1573 | 3.5 Controlling, Venting, Sealing of Liquids and Gases 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 GN 650.5 Oil Level Indicators continued Electrical specifications Assembly sequence for cable connection 1. Loosen the mounting screw and pull off the connector plug. 2. Push the contact holder out off the connector casing. 3. Loosen the cable gland, feed the cable through the connector casing and connect to the contact holder. 4. Push the contact holder back into the connector casing and tighten the cable gland for strain relief grip / seal. 5. Push the connecting plug over the connecting contacts of the oil level indicator and secure with mounting screw. Assembly instructions Two tapped holes M12 are required for mounting the oil level indicator GN 650.5. If nuts are used for mounting, two Ø 12.5 bore holes are required. For the best possible sealing effect of the O-rings, do not over- tighten the screws (max. 12 Nm). Recommended roughness of the sealing flange surface Ra = 3 μm. Oil level monitoring Max. switching voltage / Max. switched current: 150 V AC, 100 V DC / 1 A (NO) 150 V AC, 150 V DC / 2 A (NC) Max. switching capacity: 10 W (NO) / 20 W (NC) Temperature monitoring Max. switching voltage / Max. switching current: 250 V AC / 10 A 48 V DC / 5 A Oil level and temperature monitoring Connector plug: DIN EN 175301-803 type C Protection class: IP 65 Cable gland: PG 7, for cable Ø from 6 to 7 mm Cable cross-section: 2 x 1,5 mm² Caution: Magnet fields impair the proper function!
Made with FlippingBook
RkJQdWJsaXNoZXIy MTQ2MTM=